a a a a a a a a
Solar vs Diesel | Surya Solusindo Semesta
Kami Adalah Distributor Panel Surya Indonesia !
Bahasa :
IDENG
Email Contact
info@suryasolusindosemesta.co.id
Opening Hours
09.00 - 17.00
Solar vs Diesel  Save Time solar vs diesel lights 2

Save Time

Many diesel light tower customers have been consumed by the amount of time it takes to keep a diesel light tower operational. Diesel engine powered towers must be started manually daily, maintained monthly, and most annoying, refueled constantly.
Solar vs Diesel  No operator costs solar vs diesel lights 3

No operator costs

Diesel engine powered towers must be started manually daily, maintained monthly, and most annoying, refueled constantly. Solight solar light towers don’t require daily attention. Our user-friendly control settings allow you to set the solar light tower to a dusk to dawn setting, timer setting, or manual on/off switch.
Solar vs Diesel  Minimal Maintenance solar vs diesel lights 4

Minimal Maintenance

Solar systems are easy to maintain with little to no annual maintenance. Rain will usually suffice for keeping the panels clean and the batteries are maintenance free.
Solar vs Diesel  Designed for remote locations solar vs diesel lights 5

Designed for remote locations

Because Solight solar light towers are designed to “set it and forget it” – they are ideal for remote areas. Deliver the unit to the location and let it do the rest of the work. If the tower can access a wi-fi network, you can control the light tower’s functions from anywhere.
Solar vs Diesel  Save money Protect against rising gas prices solar vs diesel lights 6

Save money: Protect against rising gas prices

Gas prices are unpredictable. Being dependent on foreign oil can be risky. At least 4 times in the past 15 years, national gas prices have increased between $0.50 and $1.10/gallon in as fast as 3 months. (Data from the US EIA.) By eliminating the cost of fuel
Solar vs Diesel  A financial return with every sunrise solar vs diesel lights 7

A financial return with every sunrise

Solar light towers have a more expensive initial cost over diesel light towers, however, solar light towers pay for themselves in the first 1-3 years of use. It’s a great long-term investment.
Logo
FAQContact Us
Jasa Pembuatan Website by IKT